Site Volume Worksheet
Excavation & Soil Swell Calculator
Convert in-ground (bank) volume to loose hauled volume and compacted fill volume, size your truck fleet, and rough out haul cost - updates live as you adjust the dig.
Dig Parameters
Typical reference values - confirm swell/shrinkage against your project's geotechnical report before bidding.
Volume & Logistics Results
Bank volume
0.0 CY
in-situ, undisturbed
Loose (swelled)
0.0 CY
+0% vs bank
Compacted
0.0 CY
-0% vs bank
Profile - Bank → Loose → Compacted
Bank
Loose
Compacted
Load factor
0.000
bank ÷ loose - multiply loose volume by this to recover bank volume
Shrink factor
0.000
compacted ÷ bank - used to plan fill/borrow quantities
Truck loads
Loose volume0 CY
Truck capacity0 CY
Loads required0
Excavation cost
Bank volume0 CY
Rate$0/CY
Subtotal$0
Haul cost
Loads0
Rate$0/load
Subtotal$0
Estimated total project cost
$0